Bears  
 

 

 

 

 

 

 

 

 
 
 
   
   
 
 
  PROJECT: Soldier field Project  
   
  Materials Used: Aluminum, Flexi-glass, Flex-faces, Stainless steel  
   
  LOCATION: Chicago Bears Stadium  
   
  Project Duration: 6 months – Designed produced and installed tunnels covers in 3 weeks  
   
  About This Project :    
  Installed over 400 signs in stadium at all different level or heights.  
 
  The Creative Edge | 1475 HARVARD DRIVE, STE. F, KANKAKEE IL 60901 | Phone 815.937.1855 | toll-free: 877.937.1855
Home | About Us | Gallery | Product Lines | Services | Contact Us